We have existing 12 metres above cup-lock scaffold system erected at our site in KAFD project. We need scaffold design calculation to be done for the existing erected scaffold. In future we will also require design calculation for above 12 metres new scaffold installations in the site.
We have existing 12 metres above cup-lock scaffold system erected at our site in KAFD project. We need scaffold design calculation to be done for the existing erected scaffold. In future we will also require design calculation for above 12 metres new scaffold installations in the site.
MOBCO KAFD Project Scaffold Design Calculation-1.pdf
Scaffold Design Calculation Service